FIDIC Engineer: Ludgeřovice Sanitary Sewer System
Location:
Ludgeřovice, Czech Republic
Year of completion:
2014
Contracting Party, Client:
Municipality of Ludgeřovice
Total project cost:
380 million CZK
Scope of services:
- Executing the Engineer´s duties as defined in the contractual terms and conditions
- Checking the use of funding resources and the contractors´ invoices
- Services of the resident engineer, checks on work quality and adherence to the defined construction methods and techniques
- Setting up interim reports and final report
Project description:
The project was aimed at building a two-pipe sewer system to allow collection and treatment of wastewater in the Central Wastewater Treatment Plant in Ostrava in order to meet the limits pursuant to relevant Czech laws and regulations as well as in accordance with the Council Directive 91/271/EEC concerning urban waste water treatment with the Zoning Plan of the Ludgeřovice area.
The Project fully complies with the Water Supply and Sewer Network Development Plan of the Moravian-Silesian Region.
It also included wastewater disposal from the Markvartovice area located in the water basin upstream of Ludgeřovice.
Main technical data:
Extension of the sewer system by further 32 020 m will include new connections serving 4 474 PE for the purposes of wastewater collection, treatment and disposal.