Aquadrom Most

Location:
Most, Czech Republic

Year of completion:
2002

Client:
Statutory Town of Most

Building costs:
350 million CZK

Project description:
Pertinent pools of stainless steel with adjacent change rooms and toilets which are continued with a sauna area, steam and aromatic bath cabins and ceramic cooling pool, as well as rest and massage rooms.
The outdoor area includes three pools made from stainless steel with water features.
Pool water is treated using high-performance pumps and multiply sand filters.

Main technical data:
Swimming Pool
Area: 330 m2
Volume: 495 m3
Filter system circulation rate: 130 m3/h
Leisure Pool
Area: 550 m2
Volume: 678 m3
Filter system circulation rate: 468 m3/h
Children’s World
Area: 139 m2
Volume: 56 m3
Filter system circulation rate: 112 m3/h
Sauna Pool
Area: 8,5 m2
Volume: 7,5 m3
Filter system circulation rate: 32 m3/h
Training Pool
Area: 34,2 m2
Volume: 26 m3
Filter system circulation rate: 38 m3/h
Whirlpool
Area: 7 m2
Volume: 2,3 m3
Filter system circulation rate: 20 m3/h
Outdoor Pool
Area: 850 m2
Volume: 1125 m3
Filter system circulation rate: 300 m3/h
Wadding Pool
Area: 612 m2
Volume: 398 m3
Filter system circulation rate: 265 m3/h