Czech Embassy in the USA – Garden Swimming Pool
Location:
Washington D.C., The United States of America
Year of completion:
2002
Client:
Czech Ministry of Foreign Affairs
Building costs:
1,2 million CZK (pool equipment)
Project description:
CENTROPROJEKT GROUP supplied pool equipment for the construction of a ceramic pool with overflow channel in the garden surrounding the Czech Embassy.
Supply and installation of pool equipment, including slatted roller cover and water sanitation system based on dosing of chemicals and ozonated water
Main technical data:
Water surface: 35,7 m2
Water volume: 50,0 m2
Water depth: 1,36 m
Intensity of recirculation: 2,5 h