“Zelené” Swimming Facility in Zlín
Location:
Zlín, Czech Republic
Year of completion:
2002
Client:
Corporate Town of Zlín
Building costs:
36 million CZK
Project description:
A design-and-built-contract (pool equipment), in which the summer swimming pool located “Bartošova čtvrť” school-and-residential quarter in Zlín has undergone reconstruion and refurbishment. Original ceramic lining inside the pool tank has received a new finish by DLW foil during Phase I in 2001.
Furthermore, a new one-level building was erected to house-in changing and technical rooms and water treatment plant.
All paved areas around the pool have been renewed. Within Phase II in 2003, a recreational pool with water features, water slide, wading pool and stainless-steel relaxation pool wre constructed.
Main technical data:
Relaxation Pool
Area: 295 m2
Volume: 325 m3
Filter system circulation rate: 120 m3/h
Swimming Pool
Area: 160 m2
Volume: 64 m3
Filter system circulation rate: 45 m3/h
Wading Pool
Area: 28 m2
Volume: 5,6 m3
Filter system circulation rate: 12 m3/h
Whirlpool
Area: 28 m2
Volume: 33 m3
Filter system circulation rate: 33 m3/h