Combined Heat and Power Generation Plant at Františkov in Liberec

Location:
Liberec, Czech Republic

Rok ukončení:
2015

Client:
TEPLÁRNA LIBEREC, a.s.

Total project cost:
88.2 million CZK

Project stages:
draft design, land-use permit design, building permit design, tender documents, detail design, building occupancy permit

Project description:
The Liberec heating plant supplies heat and hot water to almost 1200 households and several public clients. The project resulted in the reduction of the steam piping length, and at the same time, heat loss was cut down almost by one third.

Main technical data:
CHP plant´s installed capacity: 3.31 MW (1.75 MW for power and 1.56 MW for heat)
Storage tank volume: 340 m3
Two gas-fired hot-water boilers with a capacity of 2 x 3 MW