Galandia Thermal Centrum in Galanta
Location:
Galanta, Slovak Republic
In operation since:
2007
Client:
Municipality of Galanta
Building cost:
223 million SKK
Stupně zakázky:
Dodavatel technologické části
Project description:
The first part of new Sports & Entertainment Holiday Centre having been constructed. The thermal swimming-facility complex includes both indoor and outdoor pools made from stainless steel for recreational and condition swimming. Furthermore, both extension of water-pool areas and inteconnection into the future accomodation building with a balneologic treatment is invisioned to be implemented.
Water heating for all the pools by means of heat pumps and exchangers using geothermal energy from municipal distribution system. The above enables year-long operation of indoor pools, covered water slide and relaxation pool to swim outside.
Main project data:
Thermal Pool
Area: 48 m2
Volume: 53 m3
Filter system circulation rate: 38 m3/h
Leisure Pool
Area: 308 m2
Volume: 385 m3
Filter system circulation rate: 192 m3/h
Wading Pool
Area: 28 m2
Volume: 5,6 m3
Filter system circulation rate: 23 m3/h
Landing Pool
Area: 32 m2
Volume: 34 m3
Filter system circulation rate: 60 m3/h
Relaxation Pool
Area: 260 m2
Volume: 306 m3
Filter system circulation rate: 168 m3/h
Landing Pool
Area: 39 m2
Volume: 8,3 m3
Filter system circulation rate: 27 m3/h
Swimming Pool
Area: 313 m2
Volume: 492 m3
Filter system circulation rate: 117 m3/h;